Friday, December 3, 2010

WildThing is slowly getting ready for 2011

2010 was a rather sad year for WildThing; she never actually splashed and stayed in the yard at PCYC all summer long... I'll spare you the list of excuses!

She is now getting ready for 2011. the interior is being stripped of that ugly/smelly/mouldy nylon carper that covers the hull side and the underside of the deck. This is turning out to be a more challenging job than originally anticipated but the scraper blade on the oscillating tool is making it somewhat easier. Once this is completed, I'll tackle the rest of the job list; a new double-ended spinnaker downhaul, a better vang arrangement and possible a longer traveler track are in order. I also plan to replace some of the teak on deck with composite material.

Stay tuned for developments and pictures...

Thursday, October 2, 2008

Side deck arrangement on Wild Thing

Thursday, September 18, 2008

First Races

Wild Thing was out racing in the local Rum Runner races at PCYC. First race was Wednesday September 3rd; a light air race where we managed to stay with the fleet but never got much going. Last week was much better; a good start at the RC boat but we got stuck for a while to leeward of a large 40 foot Hanse. We finally managed to tack to the favorite side of the course and moved up. Although I wasn’t always pointing the boat where it should go; we still managed to finish only 14 seconds behind the other Evelyn 32 at the club.